TRANSPORTATION &
INSTALLATION
Saujana Marine’s multi-disciplined team have many years of experience in complex marine operations, and can provide valuable early planning consultation to optimize the solutions with regard to vessel and equipment selection, structural design and procedures.
Subsequent engineering comprises analysis and design associated with all temporary phases of marine operation from loadout to transportation to installation. Through our strategic engineering arm, we are able to perform related calculations and analysis which includes but is not limited to the following:
- Vessel ballasting & loadout procedure
- Intact & damage stability
- Bollard pull & tow speed calculations
- Global and local vessel strength check
- Vessel motions and stability calculation
- Mooring design & analysis
- Grillage design and sea-fastening analysis
- Dynamic lifting and rigging
- Hydrodynamic analysis
- Jacket launch and upending
- Dynamic analysis for float-over installations
- FPSO mooring installation and hook-up engineering
- Production of appropriate documentation